Don’t forget to disable CRA (Calendar Repair Assistant) before the mailbox migration
If you are in the Calendar sync coexistence scenario during migration into Exchange 2010/2013, CRA (Calendar Repair Assistant) can cause a lot of troubles in terms
“It has been a long slog for the team out there, and they’ve done a tremendous job of shepherding this project through its lifecycle into the home stretch.”
If you are in the Calendar sync coexistence scenario during migration into Exchange 2010/2013, CRA (Calendar Repair Assistant) can cause a lot of troubles in terms
In this post I wanted to highlight some changes in the mailbox move logic of QMM MAgE Calendar Sync compared to the legacy CSA (Calendar